
The foundation for the pipeline to improve water supply in Bhironda Panchayat was laid yesterday by MLA Poriem, Dr. Deviya Rane, in the presence of Sarpanch Udaysingh Rane, Panch members, Executive Engineer Tivrekar, Assistant Engineer Madan Desai, Techincal Assistant Rohidas Naik, and Junior Engineer Ganesh Gaonkar.
The PWD will install, test, and commission the 1 MLD pressure filter plant at Vante, including the construction of Jack Well pump house tanks and the laying of DI rising and distribution mains. Work on the water treatment plant began six months ago, and it is expected to be completed by May.
Speaking on the occasion, MLA, Dr. Deviya Rane said, “I would like to extend my gratitude to Hon’ble CM Dr. Pramod Sawant, PWD Minister Shri Nilesh Cabral, and WRD Minister Shri Subhash Shirodkar for sanctioning this water treatment plant that will resolve water woes in Bhironda Panchayat.”